Sullivan Solar Power is no longer actively contracting for new work until further notice. Any existing Sullivan Solar Power clients needing assistance can use the form submission page to contact the company.
McGraw Residence San Juan Capistrano, CA Solar Power
The McGraw solar power installation in San Juan Capistrano was designed by the San Diego branch of our solar company in 2009. The solar energy system is mounted on a tile roof. Mr. McGraw had this to say about how our solar installation company handled his solar project, “We met the representative from Sullivan and he was so professional and friendly and walked us through the whole process, including the construction and it all went very smoothly. Sullivan has treated us fairly along the way. Whenever there was an issue or problem, they took care of it right away. We’ve been very happy with using them as our contractor for the solar installation."
We met the representative from Sullivan and he was so professional and friendly and walked us through the whole process, including the construction and it all went very smoothly.
Sullivan has treated us fairly along the way. Whenever there was an issue or problem, they took care of it right away. Weve been very happy with using them as our contractor for the solar installation.
On average, each year a solar energy system this size will:
Generate 10,973 to 14,630 kilowatt hours of clean renewable solar power.
Avoid the creation of 18,141 pounds of harmful carbon dioxide released into our air.
Provide the system owner with $3,219 in Solar Power Savings.