Sullivan Solar Power is no longer actively contracting for new work until further notice. Any existing Sullivan Solar Power clients needing assistance can use the form submission page to contact the company.
Clarkson Residence Costa Mesa Solar Power
The Clarkson solar energy installation in Costa Mesa was designed by the San Diego branch of our solar company in 2007. The solar power system for this home is roof mounted on an asphalt shingle roof. The Clarkson’s had this to say about how our solar installation company handled their solar project:
Sean came out as well as two other vendors; overall, your price was competitive and parallel to that I thought that Sean did a good job as an overall project manager, not just a sales rep. I stay in touch with Sean frequently, we share trade journal articles and I try to keep abreast of the industry.
On average, each year a solar energy system this size will:
Generate 8,550 to 11,400 kilowatt hours of clean renewable solar power.
Avoid the creation of 14,136 pounds of harmful carbon dioxide released into our air.
Provide the system owner with $2,508 in Solar Power Savings.